Resident Evil Wiki
Advertisement
Resident Evil Wiki
Prime universe
(Capcom's primary storyline)

This unnamed water treatment plant was located underneath an Umbrella facility in Raccoon City.

History[]

The facility was constructed beneath the already-established city infrastructure, necessitating the tunneling of a series of underground passages for construction crews to use. Supported by wood, they showed signs of decay by 1998,[1][excerpt 1] perhaps accelerated by the construction of an elevated highway.[2][excerpt 2]

On October 1, 1998, a group of outbreak survivors, an Umbrella researcher, included, used the treatment plant to evacuate the facility above after a renegade Tyrant stopped the only other escape route.[3]

Gallery[]

Sources[]

excerpts
  1. Excerpt from "End of the Road Set Design Minefield 4": "大掛かりな下水施設を作る際に、 古い下水沿い掘られた連絡路。こうした坑道は市内の地下各所に点在し、 朽ちるがままになっている。"
  2. Excerpt from "Set Design Minefield 4": "ラクーン市街から下水施設へと降りる階段。 幹線道路はもとより、 狭い通路や路地も各所で寸断されているようだ。"
references
  1. Resident Evil Outbreak File 2 (2004), image: "End of the Road Set Design Minefield 4".
  2. Resident Evil Outbreak File 2 (2004), image: "End of the Road Set Design Minefield 4".
  3. Resident Evil Outbreak File #2, End of the Road
Advertisement