Resident Evil Wiki
Advertisement
Resident Evil Wiki
Prime universe
(Capcom's primary storyline)

This unnamed water treatment plant was located underneath an Umbrella facility in Raccoon City.

History

The facility was constructed beneath the already-established city infrastructure, necessitating the tunneling of a series of underground passages for construction crews to use. Supported by wood, they showed signs of decay by 1998,[1][excerpt 1] perhaps accelerated by the construction of an elevated highway.[2][excerpt 2]

On October 1, 1998, a group of outbreak survivors, an Umbrella researcher, included, used the treatment plant to evacuate the facility above after a renegade Tyrant stopped the only other escape route.[3]

Gallery

Sources

excerpts
  1. Excerpt from "End of the Road Set Design Minefield 4": "大掛かりな下水施設を作る際に、 古い下水沿い掘られた連絡路。こうした坑道は市内の地下各所に点在し、 朽ちるがままになっている。"
  2. Excerpt from "Set Design Minefield 4": "ラクーン市街から下水施設へと降りる階段。 幹線道路はもとより、 狭い通路や路地も各所で寸断されているようだ。"
references
  1. Resident Evil Outbreak File 2 (2004), image: "End of the Road Set Design Minefield 4".
  2. Resident Evil Outbreak File 2 (2004), image: "End of the Road Set Design Minefield 4".
  3. Resident Evil Outbreak File #2, End of the Road
Advertisement